Skip to content
Authorized Sika Pakistan Distributor · Islamabad & Rawalpindi+92 300 5254439  ·  Staff Login
MCT Chemicals
SolutionsProductsProduct FinderTechnical LibraryKnowledge CenterProjectsCompany
Get a Quotation
SolutionsProductsProduct FinderTechnical LibraryKnowledge CenterProjectsCompanyStaff Login
Construction system · 2 products, live from MCT PIM

Concrete Curing & Protection

Concrete gains strength only while it stays moist. Curing compounds lock that moisture in from the first hours, when site water-curing is hardest to sustain.

Solutions / Concrete Curing & Protection
The application sequence

Applied in order.

1

ANTISOL E 15 ( CPK)

Curing Compounds · verified TDS

On demand
2

ANTISOL E-15 (WPK)( Pigmented )

Curing Compounds · verified TDS

Reference
Quote this system on WhatsApp
How the system works

A spray-applied curing membrane forms over finished concrete once bleed water has evaporated, holding hydration water inside the slab or wall. This replaces hessian and water crews that rarely survive a hot afternoon. On exposed structures, protective treatments then defend the hardened surface against weathering.

Why this system

Built for the job, not the shelf.

1

Cuts plastic shrinkage cracking in hot, windy weather

2

No dependence on water-curing discipline

3

Uniform strength gain across the pour

4

Works on vertical and shaped surfaces

Technical downloads

Datasheets for this system

ANTISOL E 15 ( CPK)Verified TDS on product page
ANTISOL E-15 (WPK)( Pigmented )Verified TDS on product page
Request a document on WhatsApp
Common questions

Asked on real sites.

When exactly do I spray?

As soon as the surface water sheen disappears after finishing. Too early dilutes the membrane, too late means moisture already escaped.

Will a curing compound affect later coatings or tiles?

Some membranes must be removed before bonding anything to the surface. Tell us what comes next and we will specify a compatible or removable grade from the TDS.

Is curing compound enough in extreme heat?

It is the reliable baseline. For critical pours in peak summer, combine with sensible scheduling and windbreaks. The compound protects what site practice cannot.

Verified dataDatasheets checked against the official Sika Pakistan PDSSite supportApplication questions answered by phone, WhatsApp or visitLive availabilityStock status on this page updates from our platform

Planning this job? Talk it through first.

Send us the site details on WhatsApp and get the right sequence, coverage quantities and a quotation for the full system.

Quote this system on WhatsApp
MCT Chemicals
Construction chemicals, specified correctly and supported on site.

Office 34, AL-Haj Market, Opp. DHA Phase II,
Main GT Road, Islamabad
+92 300 5254439 · info@mctchemicals.com
Solutions
Technical Library
Knowledge Center
Projects
Company
Staff Login
Image credits
WhatsAppGet a Quotation