In winter in Murree, Quetta and the northern areas, fresh concrete can freeze or gain strength too slowly to strip the forms. An antifreeze accelerator, warm materials and insulation keep the work moving.

  • 6 steps
  • 2 products
  • 5 answers
Wall cast in insulated timber formwork in snowy weather, with an accelerator dose going into a truck mixer drum

Get this solution priced Proposal brief ↓

You need this when…

  • Night frost expected after the pour
  • Formwork cannot be stripped on schedule in winter
  • Weak, scaling top surface after a cold night
  • Very slow strength gain of site concrete

The work, step by step

General guidance based on the manufacturer data sheets. Site conditions differ: confirm the system with MCT before you start. Where we do not name a product, ask us and we will confirm the right one.

  1. Step 1: Prepare the site for cold

    Keep formwork and reinforcement free of water, snow and ice, and pre-heat to at least 0 °C where needed. Use timber formwork instead of steel where possible and design formwork to insulate. Prefer higher-clinker cements to blended cements (SikaRapid-1 Antifreeze-PK p.2).

  2. Step 2: Add the antifreeze accelerator

    SikaRapid-1 Antifreeze-PK accelerates setting at moderately low temperatures and contains no chlorides, so it suits reinforced concrete (p.1). Dose 1 % of cement weight, i.e. 1000 g per 100 kg of cement. Add it with the gauging water or into the truck mixer and mix for at least 3 more minutes (p.2).

    SikaRapid-1 Antifreeze-PK Sika Request a quotation

    SikaRapid®-1 Antifreeze-PK provides progressing of concreteworking when suspending of concreting is necessary in risky cold or freezing following conditions: Slight daytime frost, Expected overnight frost, Expected cold periods When using SikaRapid®-1 Antifreeze-PK a suitable mix design has been … (TDS p.1,2)

    Pack
    05 ltr jerry can
  3. Step 3: Use a high-early-strength superplasticiser

    Sika ViscoCrete-20 HE gives high early strength and early formwork removal and is suitable for reinforced and prestressed concrete (p.1). Dose 0.2–0.8 % of cement for medium workability; never add it to dry cement (p.2). Trial any admixture combination first (SikaRapid-1 Antifreeze-PK p.2).

    Product for this stepAsk us

    The right product here depends on your site. We confirm it before naming it.

  4. Step 4: Plain (unreinforced) concrete only: accelerator

    SikaRapid-786 PK reduces protection time in cold weather and allows earlier stripping (p.1), but it is only for concrete without reinforcement (p.1). Dose 0.5–1.5 % of cement (p.2).

  5. Step 5: Check the concrete temperature at placing

    Fresh concrete should be between 5 °C and 15 °C, depending on the air temperature and the thickness of the section (SikaRapid-1 Antifreeze-PK p.2). Reject loads that arrive too cold.

  6. Step 6: Protect until it is strong enough

    Cover and insulate to stop heat and moisture loss until the concrete reaches 4–5 N/mm² (SikaRapid-1 Antifreeze-PK p.2). Sprayed curing compounds thicken below +10 °C (Sikafloor ProSeal W p.2), so rely on insulation blankets and polythene in cold weather.

Proposal brief

Cold-weather concreting: scope and system

A starting point for a site proposal. Quantities, prices and the final specification follow a site visit or photos.

Scope of work

  1. Cold-weather mix review and trial mixes
  2. Supply of antifreeze accelerator and high-early-strength superplasticiser
  3. Dosing guidance at the plant or site mixer
  4. Cold-weather placing and protection checklist

System build-up

StepProductPackSource
2. Add the antifreeze acceleratorSikaRapid-1 Antifreeze-PK05 ltr jerry canTDS p.1,2 · June 2025, Version 02.01
4. Plain (unreinforced) concrete only: acceleratorSikaRapid-786 PK05 ltr jerry can 20 ltr plastic can 200 ltr drum 1000 ltr IBC Bulk supply in tanker is…TDS p.1 · October 2025, Version 01.02

What we need from you

  • Site location and expected night temperatures
  • Element type and thickness
  • Reinforced or plain concrete
  • Cement type and brand
  • Required stripping time

Site conditions

  • Trial mixes before use (SikaRapid-1 Antifreeze-PK p.2)
  • Formwork and steel free of ice and pre-heated to 0 °C minimum where required (SikaRapid-1 Antifreeze-PK p.2)
  • Insulation and covers on site before pouring starts

Not included

  • Heating, enclosures and insulation materials
  • Concrete supply and placing
  • Cube or core strength testing

Questions customers ask

Is the antifreeze safe for reinforced concrete?

Yes. SikaRapid-1 Antifreeze-PK contains no chlorides or other ingredients that promote steel corrosion, so it is suitable for reinforced concrete (p.1).

How much do I add?

1 % by weight of cement, i.e. 1000 g per 100 kg of cement (SikaRapid-1 Antifreeze-PK p.2).

Can I use SikaRapid-786 PK in a reinforced slab?

No. Its TDS limits it to concrete without reinforcement (SikaRapid-786 PK p.1).

How long must I keep the concrete covered?

Until it reaches 4–5 N/mm² compressive strength (SikaRapid-1 Antifreeze-PK p.2). The number of days depends on temperature and mix. Ask us: it depends on site conditions.

Can I grout base plates in winter?

Yes, with care. For SikaGrout-951, raise the base plate and foundation above +10 °C and use warm water so the mixed grout is above +10 °C (SikaGrout-951 p.2).